Day 1
![Picture](/uploads/5/9/1/4/59140887/editor/fullsizerender_4.jpg)
6/4
3:45-10:00
We started helping with cleaning up the lobby.
After that we helped unload the truck.
And I also helped by painting the stage floor and flat some mats on stage.
I also began cutting out poster papers and started tracing and drawing on them.
And once we were ready we started tracing the mural with a projector.
Once everyone left I stayed for a little bit longer just by finishing up what i was doing and by cleaning and helping everyone else that needed it.
Day 2
![Picture](/uploads/5/9/1/4/59140887/published/fullsizerender-2_2.jpg?1505412463)
6/5
11:45-3:00
By the second day we were done tracing and we started painting and trying to get as much done as possible with the mural.
We also started painting on the poster papers and stared helping with the set up.
I also helped around the theater with small things just making sure no one needed help with anything.
Once we were done I helped clean everything up I helped wash the brushes and clean al the paint up and helped put everything away.
Day 3
![Picture](/uploads/5/9/1/4/59140887/published/fullsizerender-3_2.jpg?1505412850)
6/6
11:50-3:30
By the third day we were still painting on the mural and finishing small details on it.
We were also about done with the posters that we had to do.
And we were still working on the other details that we were putting in the hall.
Once our time was up we all helped clean up.
I also stayed a little longer and helped overall with anything that they needed around the hall.
Day 4
![Picture](/uploads/5/9/1/4/59140887/published/fullsizerender-4_2.jpg?1505412835)
6/7
10:55-4:30
By the fourth day we were still working on the mural and finishing up.
I would help overall around the theater.
We also helped with the set up that we were having.
And i also helped with making the red carpet that we needed to make.
Day 5
![Picture](/uploads/5/9/1/4/59140887/published/fullsizerender-5_2.jpg?1505412819)
6/8
4:00-10:00
By the fifth day we were about finishing up the mural.
We were also finishing up all the other set ups that we needed to have for the performance.
We were also setting up who is going to do what show and who is going to go and run each show.
Day 6
![Picture](/uploads/5/9/1/4/59140887/published/fullsizerender-6_2.jpg?1505412795)
6/8
4:00-10:00
By the 6th day we were done with the mural.
We were done with all the set up.
I helped run the show that night by helping with the programs and helping people get to their seats and by helping clean up at the end of the day.
Day 7
![Picture](/uploads/5/9/1/4/59140887/published/fullsizerender-7_2.jpg?1505412771)
6/11
12:00-10:20
By the last day we helped with the show I helped in the lobby and I also helped backstage and I also helped around the theater. I also helped clean and I also helped with the programs and helping make them set them up and handing them out.